Friday, February 17, 2012

Headboard Makeover

About a week ago I started my next big project, a headboard out of a recycled door. Today I finished said project. I think I'm pretty happy with how it turned out, and it was generally pretty simple (once I figured it out).

The final product took about 3 coats of paint, a little more for the cream sections and I'd say... maybe 6-10 total hours of work, but I spread that over a weekend and a week so it wasn't really too bad. It sat in my office most of the week and I'd give it another coat of paint each night until I was satisfied.

General Supplies:

* 2 colors of paint (I prefer two tone because having it all the same color is boring and the panels of the door make it easily doable for some nice contrast.)
 Over the years I've learned that paint samples can be your friend. Lowe's sells all of their samples in Satin which tends to be the most general paint choice people use in their houses. Home Depot seems to have theirs all in flat, with the exception being one of their other brands which I think had eggshell. Satin was perfect because its just enough sheen and right in the middle, so it looks nice.

* lumber: I used a 1x5 for the cap piece to make a nice overhang, and some 1x3 for the rest of the frame. Then pick a piece of crown molding or casing that you like to frame off the top and give it some nice detail.

* Nails: I used a combination of small brad nails to finish some of the lower sections as well as finish nails for a pneumatic nailer which makes the work a whole lot faster, though you could hammer all of them in and set them if you don't have any air tools.

* Wood glue and wood filler, to glue all the pieces and fill the nail holes.

* A door in a style you like.

First step is to cut the door to the length you want. The bed this is going on currently is a full bed, but in the future it may go onto a queen bed. Luckily those measurements aren't too different in width and the panels on the door lined up pretty nice, so I shot a little wide for now and it ended up framing the bed nicely and once it moves to a queen bed it will be a perfect fit, around 60 inches... give or take.

The next step was to lay everything out so I could start to get a visual of what I was doing. The plan was to run 1x3 down the sides of the door and to frame the edges and run crown molding along the top. Somewhere in all this process you should clean the door up. This one had paint on one side and was stained and sealed on the other. For paint to adhere nicely you should sand everything down, and I didn't want to put all that work into the stained side, so I decided to use the already painted side. So when I needed breaks I'd sand off and chip away any of the loose paint that was there to get a solid base layer that wouldn't pull off once it had new paint on it. Then I gave everything a quick sanding and was done.  This picture on the left shows it with more paint stripped off and with the frame clamped down after being glued and nailed.



This is where I started to run into my first problem. Without thinking about how I'd need to attach things or form corners, I cut the crown molding too short. On top of that with the frame intersecting things I had a gap looking under the crown and couldn't think of an easy way to tie it all together. Also the molding took up most of the free space at the top of the door. You can see here that the bottom of it is butted up to the top of the panels in the door. I ultimately decided I was too tired to try to figure out how to fix all of this and I didn't like it being that close to the panels, so I ran back to the store and chose a different solution.



This was my second major problem. So here you can see the other piece of 1x3 nailed to the side of the door to form part of the legs. The clamp is holding the top 1x5 to the top of the door as it dries. I was going to put the 1x3's together differently when I started and changed my mind. So I forgot these were going to be too long. This left me with about a half an inch that would push me off of the wall and leave that gap on the back of the cap piece. Not happy. So I had to take the jigsaw and rip this extra off of both sides.

I decided to worry about fixing the overhang till later in the project and moved on to cutting and nailing the molding for the top of the bed. Here's a picture of what I settled on. A bit different and a cleaner look and easier corners than the crown molding that was at a 45 degree angle. Also despite the corner pieces being pretty small I just about nailed the 45 cut and got them lined up nice, you can see there's a bit of filler on the point just to even out some of the torn up wood but it came out pretty smooth.

At this point I was just about done, everything was glued and setting up, nailed, and the holes were filled in, so it was time to take it home and get painting.

Here it is on my office floor with the first coat on everything. After working at Lowes doing paint I have come to despise yellows/creams. I like the look of them as long as I'm not trying to match or paint with them. Everything just keeps showing through and you have to do coat after coat until it finally covers everything up, and this is true of just about all paints. I don't care if you have a built in primer, it just can only cover up so much. And trying to color match a yellow? Kill me. They are impossibly tough, the machine can't do it. They never read yellow right and to match we would always dispense a little less and then start to inch up on the color until we got it right, adjusting the formula a drop or two at a time until the customer couldn't tell the difference, most of the time those we could still tell we were a little off. Yellow is just mean. The only other things I did after this was box the legs off by adding a short piece to each of the insides for the door to sit on top of and so you couldn't see the inside of the legs. After that I just had to clamp it to the bed frame, drill holes in the boards I attached at the bottom of the legs where the bedframe lined up and then put a couple of bolts through and unclamp. I think I'm pretty happy with this, another go at it would be a little smoother but I don't have any major complaints. Now for a 4 day weekend and some relaxation.

Monday, February 13, 2012

Boris Bally

 So here's a recap for this past week of school. We had our artist in residence, Boris Bally, the kids loved him and needless to say, he was awesome.

He's a really down to earth guy, super successful and honestly struck me as me in 25 years. We were incredibly similar and had some really great talks during the week, I hope I get to work with him again in the future. So since he's a metal worker primarily he brought in all kinds of stuff and the kids dove in... I did too. The plan was to use circuit boards as a sort of canvas and then to add to them however you want, almost everybody was completely engrossed in the project and the whole week flew, it was really surprising how much some of the kids excelled. With all of them finished now it will get pieced together to make a patchwork quilt of all their work and the example that Boris made them and we will install is as a permanent piece in the lobby of the arts building. Put together all of their work is really neat and you can spend an hour or more looking at all the detail people put into them.
 It was a great experience and it really has kicked  me back into gear with my own work, in part because I really want to learn more metal working (it's one of the last materials I haven't really gotten into other than plastic) I can't express the amount of fun I had, I spent nearly all my free time up in the art room working on things and just tinkering. Part of the reason was I just wrapped up Mill Girls and this was the first real project that I haven't had to think about. I just sat down and started attaching and riveting things together. I didn't plan it out I just added a piece, looked at it and added another piece until I reached a point, 3 days and maybe 10 hours worth of work later, where I said... yeah, that's done.

This was my final piece (along with a small metal globe I made) It's got a lot of personal stuff so it really is stuff that I pulled out of my junk pile as well as little touches that are important to me. I think more importantly it has jumped me back into woodworking. In one of the talks we had he mentioned that his first real job out of college was making models for a company and he was burning out and he stayed sane by doing his own work at night when he got home. It made for long days but he was able to make something for himself and I think I needed to be reminded of that since I'm going through some of the same thing right now. So This past saturday I picked up my list of projects and un-tabled the "upcycled" door headboard.

I spent maybe six hours on this, but part of that was a couple trips back and forth to home depot and some head scratching because I planned something out, changed my mind, forgot I had changed my mind and then caused myself some headaches down the line. That said, I'm pretty darn happy with it, I'll do a step by step once it's actually finished, it needs a little more work and some paint and it will be all set.

With that mostly done I've started two more projects of my own AND I'm about to get real heavy into the build for Jungle Book. I think once that is done it may be my best scene design yet, I think it's going to be a lot of fun. More on that in a moment. The two projects in my shop which will also get some pictures later are a blanket chest made out of 1x3 furring strips very similar to the treasure chest I made Erin Moeller/Damm for her wedding, but larger. The other is another "upcycling" type project where I'm trying to turn a used pallet into and end table. I haven't done this before so I'm prototyping it and just kind of winging it to see what I can turn it into to refine for another attempt some other time.

For now I will leave you with my rough sketch for Jungle Book and I will get into the concept and all the work we are doing on it in another post. Just imagine a playground in the jungle or the part of Jumanji where the jungle starts taking over the house.

Sunday, January 29, 2012

Long Overdue

Well, It's about time I get this thing back on track. I don't remember what I last updated on but I'm sure I'm forgetting some stuff and it will just get dropped. Sorry about that for anybody who was deeply invested. I've been neck deep in our spring production of Mill Girls. It opens this weekend and I'm almost finished, but then it's right back into work and starting on the Jungle Book. As an exercise for the uninitiated in tech theatre, design and tech direction when all of this is done I'm going to do a small primer on the step by step approach of designing, building, painting, and teching a show for those who don't know what all goes into it. I think it will be kind of neat to document it from start to finish and since I may actually present at the BG alum gathering that is happening I'd like to have a recent design through the whole process. So if I haven't described Mill Girls it is exactly like it sounds. Girls in the early textile industry who work in mills and fight for their rights as workers and go on strike etc. It's actually a pretty good (albeit short) show. The set features a boarding house, the gate to the factory, the main factory floor and a couple of general playing areas that are used for a couple of different purposes.

I was a little concerned about the floor going into this but I think it turned out alright. We're actually seating people on stage and over flowing into the house only if needed so it's going to be a really intimate, mostly thrust stage. All the curtains and soft goods except the cyc have come down and we're playing up the fact that we're in an industrial looking theatre and we are even using the loading bridge as the roof of a building a girl is going to jump from. It's turning out pretty nicely. The floor and gate are pulled as closely as my skill allows from the actual mill the play is based on. The entrance is a cobblestone drive leading into an open courtyard surrounded by factory and the work floor is planked rustic wood. My facebook has an album of the field trip the cast took to see the mill.

The picture on the left is an almost finished product when it comes to the floor. I have a little minor work left on in. I took this standing on the second story of our boarding house which I had to re-engineer from the house we had built for Pippi Longstockings. It looks similar but it entirely different and was completely taken apart and reassembled. I have a different view for this show. I'll be running sound from the corner of the stage and we've got both lights and sound control sitting on stage behind the audience with a live "band" of found instrument percussion which actually its a lot of fun.
I am affectionately calling this sound post as the "cage" because its shoved into the corner sitting next to our electronics box and I'm literally caged in with stuff on all for sides of me and a laptop between me and the board. It's pretty tight quarters and I can't move without a search and rescue expedition to come after me.

While I'm just about ready to be done with this show I've had a great time with it because we're really pushing what the community here views as theatre. While I've seen stuff like this done before, for our group it's fairly extreme and will confuse and weird some people out as they realize not all theatre has to be proscenium, bright and shiny musicals. I'm looking forward to the reactions. I've also gotten to play with the space a lot and I'm continuing my love of practical lighting as stage light and above the factory floor we've got 4 Ikea work lights hooked into the dimmers to actually function and it really adds a lot to the space.

They look better in context and by next week I should have some good photos of the final set and some lighting, we'll see how that goes.

I've had a couple of long nights in there painting floors and working lights, but it's 89% finished so I'm into the home stretch and starting to think out Jungle Book which has me both tired and excited. I'm starting to burn out, but Jungle Book is the last major show and then it's pretty much done for awhile other than our benefit concert thing, and then maybe a break.
End of a night of painting.


The Jungle Book plan thus far is (since it's children's theatre) to have the set as a playground, with slide, rope net rope swing and monkey bars but taken over by jungle. So think of the movie Jumanji when the jungle takes over everything. It will be like that creeping in, overgrown with plants and made of bamboo and wood. As if a child was literally out at recess and imagining this jungle land of talking animals and setting on what he or she has available to play with at the time. I'm excited and this will be another pretty non traditional set for me. That's all for now I'll be back soon with some more pictures and more exciting news including (hopefully if I can find time to start) documenting the making of a headboard out of an old 4 panel door that's sitting in my shop right now.

Tuesday, December 6, 2011

Moving on

Vespers is done. Next up Pippi... in two days. lots of programming tomorrow night.

Monday, December 5, 2011

Update Time!

When last we saw our hero he was battling dark forces amongst the rain slicked rooftops of the city. The moon was barely visibly, fading in and out due to the fog that clung to the night. Ever vigilant, watching, waiting, for the masked malevolence that plagues the city as the seedy undercurrent washes away the good done each day, leaving behind a filth and tarnish that would make even the most righteous heroes cringe.



So what am I up to now? I spent about 3 hours today hanging lights for Vespers our winter choir concert. I've got the snowflake gobos out and it looks pretty good. Tomorrow I have to hang physical snowflakes from the catwalk and hang a handful of lights and gel everything.Then, before this weekend... either tomorrow night (ugh) or wednesday night, I need to refocus all the lights and program cues for Pippi Longstocking which is this weekend. Awesome.The upside is I'm being paid for Pippi, but it's going to be a lot of work to refocus and hang these things in this short of a time by myself. I tried as much as possible to hang seperate lights for Vespers so I can at least just switch plugs back to the stuff I already had focused for Pippi, we'll see how well that goes. I still haven't read the script, because I don't have one, and I've only seen 1 rehearsal. At least I recorded it. Also, fun fact for Pippi, the show has a clown drop that I've named toothless Joe (seen here):
He's nice and creepy. I've equated him to the carny clown version of the Uncle Sam recruitment poster.

As far as class goes... nothing much new there, my freshmen are starting to work on shadow puppets for this thing that may or may not happen. Melanie wants there to be a performance thing, we've got muppet puppets that they are making, my shadow puppets and she was sword fighting. The whole thing is an amalgamation of random stuff and truly the best term for what this class has turned into is a clusterfuck. Otherwise I'm just trying to sneak through in my classes to the end of the semester. I've got too much going on and I'm too tired that we're not really doing much. I need to catch up on grades....

Sunday was my only real day off this weekend and it was spent out christmas shopping. Spending some of the money I got for gifts and finally picking up some stuff that was needed. Ended up at Ikea for about 3 hours and got the nice chair we'd been looking at. It is super mega comfy and was pretty cheap too. On top of that we picked up a really nice butcher block type cutting board, a mortar and pestle, a big rug for the living room and some picture frames. The rug rocks its got a medium pile and is also real soft and the living room at this point is just about done. With the tree up and the new plant it is really finished, just need to frame some of the serenity posters and other art we have sitting around.
 Tree with the new chair, it matches the floor and furniture really nice
  Along with the cutting board and mortar we went to an outlet mall and went into the Williams Sonoma there and picked up a real nice pan for about $20 should have been $40 something. Now we can actually saute things and have a pan that isn't non stick. So I tried that out tonight making spice rubbed beef, and oh boy is it fun to cook with. Also... yum
The best part yet is that all of these pictures were taken with the ipod touch I got, and they turned out pretty well, still not as nice as my canon point and shoot or the big camera but I'll always have it around and they were passable.

That's all for now. I may be gone for awhile since my weeks up to Christmas are jam packed with stuff. I have a rather large ballet to light immediately after Pippi comes down and they are already pretty frustrating. Next Wednesday I also have to drive a bus again because we're taking the freshman class to see Christmas Carol at the Trinity Rep. So there will likely be a review of that once we return.

Monday, November 28, 2011

Thanksgiving with a side of Muppets

Just got back from Thanksgiving in Ohio, well... got back last night at 1 am. I have to say I made some damn good fudge and such over break. There will be pictures later.

Sunday morning, went to Cleveland and met up with some fine folks for brunch, but we're going to gloss over that fact and skip right to the meat. We then went to see the new muppet movie. It was Amazing. I won't lie, I actually wept through parts of it. It was so sad, and so awesome, it just pulled at your heart to watch the muppets down and out, separated, told they aren't famous anymore and that people don't remember them. It was really a comeback story and I don't know how they could do this movie and not do a new muppet show. They've set it up, and holy crap will it work. The celebrity support within the movie, the jokes, the new voice actors doing old voices, it was all there. There were great little touches that the hardcore fans will love, really touching moments, pictures of old muppet show hosts with them at times, everything. The addition of Walter is great because the older folks who grew up on it ARE Walter and all the new fans can get welcomed in by him.

I won't really give anything away but I will say one of my favorite parts is that Animal is in anger management and he is "in control" I loved it. It was everything I could hope for in a restart of the muppets. My only complaint was the inclusion of one song that just didn't fit, it was jarring, confusing and even the muppets weren't sure why it was happening. If you've seen the movie, you probably know which one I'm talking about.

Fun facts:

The banjo that Kermit plays during the rainbow connection is his original banjo from the first movie.

it's the first theatrically released muppet film not to include Frank Oz

Pixar fine tuned parts of the script for Disney

Some of the full body muppet shots use original remote control muppets that allow it to exist and move on it's own as it is controlled off screen. They chose to utilize these so they could be sure the muppets exist physically in the real world rather than being digitally animated.

Friday, November 11, 2011

A Catching up of Sorts

I think it is about time I get caught up on this thing, so here it goes. This is my first real day off in quite awhile (thank you national holidays) it has been spent inside not doing a thing, later I will play video games, currently I will update this and eat some hot dogs. Later later... chinese food. I think that is a good plan for a day off.



So Seussical went pretty well. Each night had some mistakes and issues, nothing I really could have done anything about so I didn't stress too much about them. Friday night they broke a piece of facing off of one of the front steps so I was going to cut a new piece early Saturday and paint it, but when I got there my crew had already reattached it and were touching it up. Needless to say my tradition of taking a piece of facing from every set I've designed continued and during strike the broke off piece was set aside and is now next to me in my office at home.



Of course given that during a tech week everything that goes wrong does (thank you murphy's law) my jeep stopped working. Wouldn't turn over, lights still worked, new battery did nothing, didn't work. so after a couple days of that Melanie and Roberto Mollo (Melanie is the music teacher and director) got AAA to come out and look at it and then got it towed to a place about a mile from work. The guy was great and fast, reminded me a lot of the place we go way back home, so I'm sure I'll be going back if I have any other problems. Waited around 3 hours for the tow truck to actually show up, towed it there wednesday night, picked it up thursday afternoon and now it runs like a champ. It ended up being a combination of battery, cables and shot connections. In either case I'm up and running and in good shape now with a brand new battery for winter.

So thursday was the last day of my required after school hours since we are ending the "fall sports" section and moving into winter. I decided it was time for a small project. Now that I'll actually have some free time I'm planning on making a lot of changes to the shop, stuff I had wanted to do when I showed up but hadn't had the chance to get to. First project was a desk for the shop. This way I've got somewhere to work and keep important stuff rather than trying to find it in a bunch of different places. When all is said and done this desk will have cost about $6, and none of it was my money. Between materials we already had and stuff I had picked up a couple weeks ago I did most of the work in a few hours. I just need to add drawers to the right hand side and give the whole thing a nice coat of paint. I'm toying with the idea of having part of the surface be chalkboard (mostly because we have some chalkboard paint I want to play with) I figured it'd be useful for leaving notes when we don't have any paper.

so that's it for now. Tech class is already gearing up to help ACTSA (All Children's Theatre at Saint Andrews) build the set for Pippi Longstockings. I'm also going to do a simple easy lighting design for that and pick up 2 or $300 which will be nice. One show down, another show up.... sounds about right.